These pictures were all in the program on Sunday (VERY SMALL)... So, in case you wanted to get a larger view (or you missed church on Sunday) - here you go...
New gas lines have been hooked up and are operational. The new gas meter near the southeast corner is installed and the one in the furnace room has been removed.
The rooftop AC/heating units are now completely functional.
Concrete sidewalks and curbing have been poured around the new building.
Cabinets have been installed in the nursery area and the classroom. This cabinet is in the infant nursery. The first coat of paint is also completed in the nursery and classroom.
The ceiling in the worship center has been painted black. The acoustical "clouds" have been installed and are being covered with drywall.
The ceiling grid in nursery, AV room, and golden ager room has been completed. They are starting to install the ceiling lights in those areas.
The welcome center has been stained and one coat of varnish has been applied. (They are building the welcome center in the large classroom.)
All of the outside glass windows and doors have been installed. The crosses will soon be covered with stucco. The roof shingles on the front part of the building have been installed.
Concrete steps have been completed for the new exit door to the boiler room, the baptistery and the sound booth (baptistery steps seen here).
The electrical transformer was put in place (on top of the vault) and the main distribution panel was installed. The wiring between the transformer and the main panel has been completed.