This Sunday we will give everyone an opportunity to tour the building! It will happen as part of the morning services. Don't miss it!!
Here are some preview/update pictures:
This is the most painful part so far... watching beautiful trees get cut down. It is making room for the new entryway/driveway.
I was on the roof of the new building and saw the sign through the octagon and thought it might be a nice picture.
This is taken from the lower roof (above the nurseries) - through an HVAC opening. The designs on the floor are the layouts of the acoustical "clouds" that will hang below the ceiling and provide sound help. They were laid out on the floor so that the HVAC guys can avoid place the heating/air conditioning "vents" at the right locations (in between the clouds).
We made a last minute design change (making the classroom larger) and to do that, we needed to move a PVC plumbing pipe. The quote from a subcontractor was $2000. So Jeff and Steve did the grunt work... finally cost = $300!!! Thanks Steve and Jeff!!!

The "crosses" are in place! They will be covered with a stucco-type material and stained.
Steve does it all... even a little childcare while Elise's mom (Heidi) takes a look at some color choices for staining the stucco.